Foothill Boulevard from Hemlock Avenue to Almeria Avenue Street Improvement Project (Malaga Bridge)

Project Status

  • Project Status: Environmental/ Design
  • Anticipated Project Completion: Winter 2026

Project Description

This project will consist of widening the existing roadway to a 6-lane configuration to include the addition of one lane in each direction to provide a 6-lane configuration, left turn pockets, bike lanes, sidewalk and ADA compliant curb access return ramps. The project will also install a traffic signal at the intersection of Foothill Boulevard and Beech Avenue as well as the removal of the historic Malaga Bridge at the PE Trail and the construction of a new longer span bridge in its place. This project will improve safety and operations along Foothill Boulevard.

Project Location

Foothill Boulevard from Hemlock Avenue to Almeria Avenue Street Improvement Project

To view the Malaga Bridge Opportunities study, please click here.

For More Information

If you have any questions about this project, please contact the Project Engineer by email or (909) 350-6649.